Skip navigation

In Tele Visit Project Summary

Download original document:
Brief thumbnail
This text is machine-read, and may contain errors. Check the original document to verify accuracy.
ATTACHMENT A

inteleVISl'J'TM PROJECT SUMMARY

Project includes:
• 39 inteleVISlJTM Kiosks configured to provide on-site end remote paid video visitation:
o 3 Visitor Kiosks
o 35 Inmate Kiosks
o 1 Cart/Mobile Kiosk
• No Fee charged for On-site Visits
• Rate charged for remote visits: $0.30 per remote visitation minute
• Visitation recordings wilJ be stored for on-line access and rcviewable for l year from the visit
date.
• Pay Tel will perform the installation and training.
• Pay Tel will provide wiring as necessary
• Pay Tel will provision the internet bandwidth necessary to support video visitation.
• Pay Tel will coordinate the delivery, installation and training schedule with Sheriff.

Sheriff's Office Responsibilities:

•

Sheriff will be responsible for any desired furniture or partitions to be provided in the visitation
areas.